Kitchen handover: 24 items to check at acceptance

Taking handover of a new kitchen — the 24-item acceptance checklist covering temperature, flame, water, electrical, gas and documentation.

Caccia Pro Mühendislik EkibiApril 5, 2026

Handover is the critical moment

The most critical moment of a new kitchen installation is handover. The acceptance protocol signed here lays the foundation for warranty, liability and service for the next 5-10 years.

What we see in the field: most operators say "looks like everything works" and sign. Three months later — a fryer thermostat fault, hood plenum leak, gas-line pressure loss — and because it was "accepted", the dispute begins.

Here's the 24-item acceptance checklist we use in the field. Each item should be marked done / not done / note and attached to the protocol.

A. Visual and general (4 items)

1. Visible damage check

No scratch, dent or deformation on stainless surfaces. Glass surfaces (pizza oven door) crack-free, door gaskets intact.

2. Label and serial number

Each unit's nameplate legible, CE label present, serial matches handover doc.

3. Accessory completeness

Baskets (fryer), trays (oven), GN pans (bain-marie), spare keys, manuals — match packing list.

4. Alignment and level

All equipment plumb on a spirit level. Line equipment flush, no more than 2 mm height delta between units.

B. Electrical (5 items)

5. Ground continuity

Each unit's ground line tested with a meter. < 0.1 Ω continuous resistance required. Otherwise shock risk.

6. Phase balance

On 3-phase equipment, panel-side current per phase should be close. Imbalance → balance the load — long-term, burns motors.

7. Breaker groups

Verify each unit on its own breaker group at the panel. Labels legible.

8. Grounded socket test

For standalone plug-in equipment, grounded socket test (live/neutral/ground correct).

9. Emergency stop test

The emergency stop button on the main panel — pressing should cut all cooking equipment (ventilation and lighting may stay).

C. Gas (4 items)

10. Leak test

The full gas line checked with soap-bubble test. No bubbles at any joint. Performed by professional, documented in writing.

11. Pressure test

Verify regulator outlet pressure (natural gas 20 mbar, LPG 30 mbar) with a manometer.

12. Fire damper

Hood-interlock gas shutoff tested — fire detection or manual trigger cuts gas.

13. Gas detector

If installed, calibrated test gas triggers the alarm. Response under 30 seconds.

D. Water and drainage (3 items)

14. Water in and out

Ice machine, dishwasher, steamer — no leaks, correct supply pressure (typically 2-4 bar).

15. Drain flow

Kitchen floor drain, dishwash drain, hood drain — test by pouring water; check flow rate and back-up.

16. Hot water temperature

Dishwash hot water (typically 60-65°C); for sanitising rinses requiring 82°C+, verify boiler heating capacity.

E. Cooking equipment performance (5 items)

17. Temperature accuracy

Each cooking unit (oven, fryer, plate) thermostat verified with IR thermometer. Within ±5°C.

18. Flame quality

Gas equipment flame should be blue-white, not yellow-tipped or wavy. Yellow flame → air mix wrong → carbon buildup + efficiency loss.

19. Warm-up time

Manufacturer's stated warm-up time tested. Pizza oven typically reaches 450°C in 30-40 min, plate 250°C in 15-20 min.

20. Fan and motor noise

Hood fan, convection oven fan, fridge compressor — no abnormal sound, vibration or smell.

21. Cooling performance

With doors closed, check interior temperature after 2 hours. Fridge < 4°C, freezer < -18°C.

F. Documentation (3 items)

22. CE certificate and Declaration of Conformity

CE Declaration of Conformity delivered for each unit. Asked at annual inspections.

23. Warranty card and service network

Manufacturer warranty (typically 2 years), authorised service list, emergency service phone in writing.

24. User manual (local language)

Local-language manual (Ministry of Industry mandate), maintenance guide, parts catalog. Missing → warranty loss ground.

Don't sign until all 24 items are marked done. For any missing item, note on the protocol with a committed completion date and responsible party.

Practical protocol format

The acceptance protocol should include:

  • Date and time
  • Item-by-item checklist
  • For missing items, completion date and owner
  • Operator and installer signatures
  • Kitchen photos (each unit + panel + full line)
  • Test reports (gas leak, electrical ground, pressure)

Conclusion

Handover takes 2-3 hours. Our recommendation: with the installer's technicians present, have your own chef and electrical/plumbing lead present too. Walk through all 24 items.

This discipline runs the next years' warranty, service and insurance smoothly. On Caccia Pro installations this checklist is standard procedure — ask and we'll share the protocol format.

#handover#acceptance test#checklist#commissioning

Get a quote for your kitchen.

Tell us the scale, the flow and the target capacity — and we'll come back with a tailored proposal in 48 hours.

Analytics and marketing cookies load only with your explicit consent. You can change your preference any time from the menu. Learn more